conversion refinery and even that is now more than 20 years old. The product slate of all the existing local refineries typically comprises of Naphtha, Motor Gasoline (MS), High Speed Diesel (HSD), Furnace Oil (FO), Kerosene, Jet fuel (JP-1 & JP-8), High-Octane Blending Component (HOB
What materials are used in petrochemical industry in Pakistan?
bulk consumption is of Polyethylene (PE) and Polypropylene (PP). At present, the petrochemical industry of Pakistan is limited to production of Polyvinyl Chloride (PVC), Polystyrene (PS), Synthetic Fibers, (i.e. polyester), and Purified erephthalic Acid (PTA) and Polyethylene Terephthalate PET resins. There is no production of any
How many barrels of crude oil a day can a refinery process?
The Refinery has a capacity of processing 50,000 barrels per day of crude oil into a variety of distilled petroleum products such as Furnace Oil, High Speed Diesel, Kerosene oil, Jet fuel and Motor gasoline etc. The 3rd Quarter Report Mar 2024 has been placed on the website for shareholder’s review.
Where is cotton grown in Sindh?
In Sindh province cotton is grown in more than one million acres in the districts of Benazirabad, Hyderabad, Jamshoro, Mirpur Khas, Naushero Feroz, Sanghar, Badin, Sukkar, Ghotki, Tharparkar, Thatta, and Umar Kot.
How deep conversion integrated refinery & petrochemical complex is needed?
eld Deep Conversion Integrated Refinery and Petrochemical ComplexIn addition to the production from existing refineries, there is a need to add at least one new (greenfield) 300-400kbpd deep conversion refinery and petrochemical complex, along with related import ter inal and pipelines infrastructure, to meet the forecasted demand.4.2. Incentiv
What are the exemptions in a refinery project?
the date of commencement of commercial production of the project.6.1.2.5. Exemption from levy of customs duties /levies, surcharges, withholding tax, general sales tax, any other ad valorem tax or any other levies/duties on import of any equipment to be installed, or material to be used in the refinery projects without any precondition r obtain